Project Description

As a preferred structural consultant for the GTAA, Milman & Associates Limited inspected the guideway structure and support system for the LINK Train on multiple occasions to identify and address structural deficiencies and possible safety concerns. To ensure accurate, results, our team of inspectors was able to access the guideway structure of one of the train’s systems via a maintenance vehicle while the other was in operation. Beyond an overall visual assessment of the guideway’s structural integrity, we inspected the train’s 53 supporting concrete piers, who’s proper function is integral for performance and safety. We designed crack repair procedures for the pier surfaces and grout restoration under the bearing plates, and we oversaw each pier repairs during the construction stage.