Project Description

Our longterm client Bell Canada commissioned Milman to conduct a complete structural review of one of Bell’s main buildings at 21 Canniff Street to assess the existing structure’s ability to satisfy modern design codes and support additional floors. Based on a complicated seismic and static structural analysis review, we found that the building’s structure was capable of supporting three additional floors. As part of the project, the structural team also designed a steel platform on the roof to house a 2.0 MW diesel generator assembly.